|
Issue |
Title |
|
Vol 10, No 2: Oktober 2012 |
PENGARUH IKLIM ORGANISASI DAN PENGEMBANGAN KARIR TERHADAP KEPUASAN KERJA KARYAWAN |
Abstract
PDF
|
Audra Bianca, Wahyu Susihono |
|
Vol 11, No 1: April 2013 |
PENGARUH MOTIVASI KARYAWAN TERHADAP PRODUKTIVITAS PERUSAHAAN TEKSTIL PT. UNGGULREJO WASONO DI PURWOREJO |
Abstract
PDF
|
Dedi Iskandar, Ida Betanursanti |
|
Vol 10, No 2: Oktober 2012 |
PENGARUH PENGGUNAAN PREHEATER PADA BASIN TYPE SOLAR STILL DENGAN TIPE KACA PENUTUP MIRING TERHADAP EFISIENSI |
Abstract
PDF
|
M. Syafwansyah Effendi, M. Khafiz Arifin, Muhammad Hasbi |
|
Vol 12, No 2: Oktober 2014 |
PENGEMBANGAN KONSEP SEPEDA PERKOTAAN DENGAN MEMPERTIMBANGKAN KRITERIA ERGONOMI |
Abstract
PDF
|
Bambang Suhardi, Ilham Priadythama, Muhammad Arief |
|
Vol 12, No 1: April 2014 |
PENGEMBANGAN MESIN FERMENTASI ROTI MENGGUNAKAN PENDEKATAN VALUE ENGINEERING (VE) |
Abstract
PDF
|
Rachmad Hidayat, Anis Arendra, Sabarudin Akhmad |
|
Vol 11, No 2: Oktober 2013 |
PENGEMBANGAN MODEL INTEGRASI DELPHI-AHP- MARKOV DALAM PERENCANAAN KEBUTUHAN SUMBER DAYA MANUSIA |
Abstract
PDF
|
Ronald Sukwadi |
|
Vol 13, No 2: Oktober 2015 |
PENGENDALIAN PERSEDIAAN BAHAN BAKU OBAT DENGAN MENGGUNAKAN METODE EOQ PROBABILISTIK BERDASARKAN PERAMALAN EXPONENTIAL SMOOTHING PADA PT. XYZ |
Abstract
PDF
|
Fila Dristiana, Tedjo Sukmono |
|
Vol 12, No 2: Oktober 2014 |
PENGENDALIAN PERSEDIAAN PADA KONDISI STOKASTIK DAN HARGA BERTINGKAT MENGGUNAKAN SIMULASI |
Abstract
PDF
|
Marcelly Widya Wardana, Farham HM Saleh, Ali Parkhan |
|
Vol 13, No 2: Oktober 2015 |
PENGUKURAN BEBAN KERJA TENAGA KERJA DENGAN METODE WORK SAMPLING (Studi Kasus di PT. XY Yogyakarta) |
Abstract
PDF
|
Jono - |
|
Vol 10, No 2: Oktober 2012 |
PENGUKURAN EFEKTIVITAS MESIN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. SETIAJI MANDIRI |
Abstract
PDF
|
Nindita Hapsari, Kifayah Amar, Yandra Rahadian Perdana |
|
Vol 15, No 2: Oktober 2017 |
PENGUKURAN KINERJA MESIN PRODUKSI MENGGUNAKAN METODE OVERALL THROUGHPUT EFFECTIVENESS GUNA MENINGKATKAN HASIL PRODUKSI DI PT XYZ |
Abstract
PDF
|
Sigit Wahono, Tedjo Sukmono |
|
Vol 17, No 2: Oktober 2019 |
PENGUKURAN KINERJA RANTAI PASOK UKM KALAMAI UNI WAR MENGGUNAKAN METODE SCOR DAN FUZZY AHP |
Abstract
PDF
|
Misnadesi Misnadesi, Misra Hartati |
|
Vol 15, No 2: Oktober 2017 |
PENGUKURAN KINERJA UMKM MENGGUNAKAN PERFORMANCE PRISM |
Abstract
PDF
|
Cynthia Agelina Purnomo, Yuswono Hadi |
|
Vol 16, No 1: April 2018 |
PENGURANGAN DEFECT PADA PRODUK SEPATU DENGAN MENGINTEGRASIKAN STATISTICAL PROCESS CONTROL (SPC) DAN ROOT CAUSE ANALYSIS (RCA) STUDI KASUS PT. XYZ |
Abstract
PDF
|
Moch. Teguh Fajrin, Wiwik Sulistiyowati |
|
Vol 12, No 1: April 2014 |
PENINGKATAN KEKUATAN PUNTIR PRODUK BALING-BALING KAPAL BAHAN KUNINGAN DENGAN PENDEKATAN METODE TAGUCHI PADA INDUSTRI KECIL PENGECORAN NEGARA KANDANGAN KALIMANTAN SELATAN |
Abstract
PDF
|
M. Syafwansyah Effendi, M. Khafiz Arifin, Ahmad Hendrawan |
|
Vol 16, No 2: Oktober 2018 |
PENINGKATAN KUALITAS CUSTOMER SERVICE TELKOMSEL SURABAYA DENGAN METODE SERVICE QUALITY |
Abstract
PDF
|
Benedictus Rahardjo, Septianda Angelica, Iviani Winoto, Natasah Bunardi, Elma Cathlin Tangradi |
|
Vol 14, No 2: Oktober 2016 |
PENINGKATAN KUALITAS PELAYANAN AKTA KELAHIRAN MENGGUNAKAN PENDEKATAN SIX SIGMA DI DINAS KEPENDUDUKAN DAN PENCATATAN SIPIL KABUPATEN PELALAWAN |
Abstract
PDF
|
Denny Astrie Anggraini, Satriardi Satriardi |
|
Vol 15, No 2: Oktober 2017 |
PENINGKATAN KUALITAS PRODUK PADA MESIN PRODUKSI NONWOVEN SPUNBOND DENGAN MENGGUNAKAN METODE SEVEN TOOLS DAN FMEA |
Abstract
PDF
|
Mochammad Damaindra, Atikha Sidhi Cahyana |
|
Vol 17, No 1: April 2019 |
PENINGKATAN KUALITAS PRODUKSI PELAT DINDING DAN ATAP INSULATED PANEL SYSTEM PENERAPAN METODE SIX SIGMA DENGAN KONSEP DMAIC |
Abstract
PDF
|
Ridwan Usman |
|
Vol 17, No 1: April 2019 |
PENINGKATAN PRODUKTIVITAS MELALUI UPAYA ENVIROMENTAL RISK ANALYSIS UNTUK MENDUKUNG PELAKSANAAN GREEN PRODUCTIVITY |
Abstract
PDF
|
Agus Supriyadi, Athika Sidhi Cahyana |
|
Vol 11, No 2: Oktober 2013 |
PENJADWALAN 20 JOB 8 MESIN DENGAN METODE GENETIC ALGORITHM (GA) |
Abstract
PDF
|
Didit Damur Rochman, Rendiyatna Ferdian |
|
Vol 16, No 1: April 2018 |
PENJADWALAN FLOW SHOP N JOB M MESIN DENGAN METODE FIRST COME FIRST SERVED (FCFS), EARLIEST DUE DATE (EDD) DAN ALGORITMA HEURISTIK POUR |
Abstract
PDF
|
Dwi Agustina Kurniawati, Abdul Latief Irsyad |
|
Vol 13, No 1: April 2015 |
PENJADWALAN FLOWSHOP DENGAN MENGGUNAKAN SIMULATED ANNEALING |
Abstract
PDF
|
Muhammad Firdaus, Ilyas Masudin, Dana Marsetya Utama |
|
Vol 13, No 2: Oktober 2015 |
PENJADWALAN JOB SHOP STATIK DENGAN METODE SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN |
Abstract
PDF
|
Moh. Husen, Ilyas Masudin, Dana Marsetiya Utama |
|
Vol 14, No 1: APRIL 2016 |
PENJADWALAN MESIN SCREW PRESS STASIUN KEMPA PADA PRODUKSI CPO (CRUDE PALM OIL) DAN KERNEL DENGAN MENGGUNAKAN METODE INDIKATOR |
Abstract
PDF
|
Heri Wibowo |
|
126 - 150 of 199 Items |
<< < 1 2 3 4 5 6 7 8 > >> |