PERENCANAAN PERSEDIAAN KOMPONEN PADA PERUSAHAAN ORIGINAL EQUIPMENT MANUFACTURER MENGGUNAKAN METODE PERSEDIAAN DETERMINISTIK DINAMIS
DOI:
https://doi.org/10.12928/si.v17i1.9354Keywords:
inventory control, dynamic deterministic, optimum inventory, reorder pointAbstract
Determination of inventory of raw materials and components is needed to support the smoothness of the production process. Inventory management is done, in order to determine optimum inventory level, order lot size and reorder time that can minimize total inventory cost. This research applies some method in dynamic deterministic inventory model by comparing those method based on the lowest inventory total cost. This model solved basic inventory management problems, which are; the amount of goods to be ordered for each time the order made , when the order need to be made (r) and safety stock level. Based on this research, it is known that company may decrease its inventory cost by implementing suggested inventory methodReferences
Bushuev, M. A., Guiffrida, A., Jaber, M. Y., & Khan, M. (2015). A review of inventory lot sizing review papers. Management Research Review, 38(3), 283-298.
Chandradevi, A., & Puspitasari, N. B. (2016). Penerapan Material Requirement Planning (MRP) dengan Mempertimbangkan Lot Sizing dalam Pengendalian Bahan Baku pada PT. Phapros, Tbk. PERFORMA: Media Ilmiah Teknik Industri, 15(1).
Chang, C. T. (2016). Inventory models with stock-and pricedependent demand for deteriorating items based on limited shelf space. Yugoslav Journal of Operations Research, 20(1).
Herjanto, E. (2007). Manajemen Operasi (Edisi 3). Grasindo: Jakarta.
Maulana, A., & Kusumawardhani, A. (2015). Analisis Efisiensi Persediaan Bahan Baku Susu Sapi Murni Dengan Menggunakan Metode Economic Order Quantity Pada Soto Sedeep. Semarang: Universitas Diponegoro (Doctoral dissertation, Fakultas Ekonomika dan Bisnis).
Nur Bahagia, S. (2006). Sistem Inventory. Bandung: ITB Publisher.
Minguella-Canela, J., Morales Planas, S., Gomà Ayats, J., & de los Santos López, M. (2018). Assessment of the potential economic impact of the use of AM technologies in the cost levels of manufacturing and stocking of spare part products. Materials, 11(8), 1429.
Rahmayanti, D., & Fauzan, A. ( 2013). Optimalisasi sistem persediaan bahan baku karet mentah (lateks) dengan metode Lot Sizing (studi kasus: PT Abaisiat Raya). Jurnal Optimasi Sistem Industri, 12(1), 317-325.
Russell, R. S., & Taylor, B. W. (2008). Operations management along the supply chain. John Wiley & Sons: New York.
Siagian, Y. M. (2007). Aplikasi Supply Chain Management. 2007: Grasindo.
Simatupang, R. S. (2017). Penerapan Metode Period Order Quantity (POQ) dalam Pengendalian Persediaan Palm Kernel Oil (PKO) dan Crude Palm Oil (CPO).(Studi Kasus: PT Perkebunan Nusantara III Medan).
Taryana, N. (2008). Analisis Pengendalian Persediaan Bahan Baku PAda Produk Sepatu Dengan Pendekatan Teknik Lot Sizing Dalam Mendukung Sistem MRP (Studi Kasus di PT. Sepatu Mas Idaman, Bogor). . Bogor: Fakultas Teknologi Pertanian, Institut Pertanian Bogor.
Tersine, R. J. (1994). Principles of inventory and materials management. London: Prentice Hal.
Tiwari, S., Jaggi, C. K., Gupta, M., & Cárdenas-Barrón, L. E. (2018). Optimal pricing and lot-sizing policy for supply chain system with deteriorating items under limited storage capacity. International Journal of Production Economics, 200, 278-290.
Wonglimpiyarat, J. (2018). The pursuit of original equipment manufacturer strategy: insights from an Asian country. R&D Management, 48(2), 243-252.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.