Evaluasi Pasca Huni Pengguna Internal terhadap Performa Fisik Kamar Operasi

Authors

  • Martika Intan Kusumawati Muhammadiyah University of Yogyakarta
  • Widodo Hariyono Universitas Ahmad Dahlan
  • Iswanta Iswanta Muhammadiyah University of Yogyakarta

DOI:

https://doi.org/10.12928/kesmas.v11i2.6156

Keywords:

internal users, physical performance of the operating room, post-occupancy evaluation

Abstract

Background: RS PKU Muhammadiyah Gamping is a Class C Hospital with a capacity of 154 beds. Hospital operating rooms are the most rigorous, complex and require more investment than other functions. The operating room is specially designed to perform elective and cito surgical procedures. Method: Type of descriptive observational study. Population of all internal users of Operating Room. The sample size is 20 people. Results: The operating room is located on the fourth floor of the hospital facing the ICU chamber. The operating room has a building area of about 50.4x18 meters. The operating room has four operating rooms consisting of two large operating rooms, a small operating room, and a dedicated operating room equipped with c-arm neurosurgery. The operating room area I=6.3x6.3 meter, operating room area II=7.2x6.35 meter, operating room area III=7.2x6.35 meter, operating room area IV=7.2x7.2 meter. Lighting 348 lux operating room, 18.160 lux field operation lighting. Operating room humidity=44.3%. Operating room temperature=27.3oC. Noise operating room=52.4dB. The pressure inside the operating room=1013.3 mBar equals the pressure in the corridor=1013.3 mBar. Airflow on the non-asprating diffuser over the operating table 0 ftm. Filterization shows the index of standard germs. Technical aspects are approaching the standard. The results of the functional and process aspects are not in accordance with the standards. Conclusion: Humidity, pressure, temperature, and noise levels are not in accordance with ministry of health of Republic Indonesisa standard in 2012, based on internal user perception of technical aspect is approaching standard, while functional aspect and process are considered not in accordance with standard.

Author Biographies

Martika Intan Kusumawati, Muhammadiyah University of Yogyakarta

Program Magister Manajemen Rumah Sakit, Program Pasca Sarjana

Widodo Hariyono, Universitas Ahmad Dahlan

Program Studi Ilmu Kesehatan Masyarakat, Fakultas Kesehatan Masyarakat

Iswanta Iswanta, Muhammadiyah University of Yogyakarta

Magister Manajemen Rumah Sakit, Fakultas Kedokteran dan Ilmu Kesehatan

References

Hatmoko AU. Arsitektur Rumah Sakit. Yogyakarta: Global Rancang Selaras; 2010.

Gupta A, Kant S. Hospital Architecture: Emerging Issues and Strategic Options. Acad Hosp Adm. 2004;16(1).

Kalantari S, Snell R. Post-Occupancy Evaluation of a Mental Healthcare Facility Based on Staff Perceptions of Design Innovations. HERD. 2017 Jul;10(4):121–35.

Barlex MJ. Guide to Post Occupancy Evaluation. University of Westminister; 2006.

Clancy CM. Designing for Safety: Evidence-based Design and Hospitals. Am J Med Qual Off J Am Coll Med Qual. 2008 Feb;23(1):66–9.

Kunders GD. Hospital Planning Design and Management. New Delhi: Mc Graw Hill; 2000.

Wibisono A. Hubungan Antara Penglihatan, Pencahayaan, dan Persepsi Manusia dalam Desain Interior. Ambiance. 2013 Jul 30;2(2).

Tangoro D. Utilitas Bangunan. Jakarta: Universitas Indonesia; 2000.

Rao S. Designing Hospital for better Infection Control: an Experience. Med J Armed Forces India. 2004 Jan;60(1):63–6.

Direktorat Bina Pelayanan Penunjang Medik dan Sarana Kesehatan. Pedoman Teknis Bangunan Rumah Sakit: Ruang Operasi. Kementerian Kesehatan Republik Indonesia; 2012.

Memarzadeh F, Manning AP. Comparison of Operating Room Ventilation Systems in the Protection of the Surgical Site. ASHRAE Ransactions. 2002;108:3–15.

Downloads

Published

2017-09-28